Turnkey industrial facility – A low-carbon, reversible development
FIRE developed a tailor-made industrial building on behalf of Montea, combining operational excellence, modularity and environmental performance.
Located east of Lyon on a site of over 3 hectares, with direct access to the Eastern Ring Road, the A43 motorway, Lyon Saint-Exupéry Airport and Lyon Saint-Exupéry TGV station, this approximately 10,000 sqm facility benefits from enhanced accessibility, including public transport connections.
An industrial tool designed for the end user
Developed for a Renault subsidiary, this next-generation facility brings together the company’s historic activities alongside new high-value technological production lines, including 3D printing, metal fabrication and advanced manufacturing units. The site supports nearly 170 jobs, contributing directly to the Group’s industrial capabilities.
A Low-Carbon, Scalable, and Reversible Asset
Designed to be reversible, the building incorporates high environmental performance standards: a rooftop photovoltaic power plant, enhanced insulation, and volume flexibility to anticipate the evolution of industrial processes. This approach ensures long-term performance and a strong capacity to adapt to future uses.

The FIRE Advantage
+ Delivery of a bespoke, turnkey facility in under 24 months, from land sourcing through to the definition of operational requirements.
+ User support in integrating new high-value technological production lines.
+ Forward-looking design, embedded from the outset to ensure long-term adaptability of uses and sustained asset value for the investor.
- Location
Rhône (69) - Area
9,440 m² - Delivery Date
Q1 2021 - Architect
Agence Franc - Investor
MONTEA